Quicklinks

PROJECTS

Information . Communication . Resources . Election-May 14

Technology
  • Replace the Technology - Wide Area Network with business class components and a true core switch.  This will provide each campus with a robust wireless infrastructure to support a variety of wireless devices such as laptops, iPads, iPod Touches and computers on all campuses.  (Estimated cost $610,899)
  • Provide Technology – Local Area Network Upgrades at the High School, Junior High and Intermediate campuses.  (Estimated cost $1,227,846)

Career / Co- Curricular Facilities
  • Remodel the classrooms at the high school for the growing Career and Technology classes at the high school which includes Media Technology.  (Estimated cost $272,183) 

 

  • Remodel and upgrade the existing home economics classroom to serve the Culinary Arts Program at the high school.    (Estimated cost $604,850)

 

  • Provide HS Theater renovations:  lighting, sound, ADA upgrades and interior/foyer upgrades.  (Estimated cost $920,582)

 

  •  Provide improved area for drill team and locker rooms at the high school.  (Estimated cost $152,059)

Athletic Facilities
• Build a new Athletic Sports Complex / Stadium - to include: field house, seating for about 6,400, press box, track and field surfaces and concessions, and land acquisition. The actual construction budget for the new stadium, track venue, and game day field house is $17.4 million. The total amount of $20,379,304 includes costs for new turf at the old stadium, and demolition of the bleachers (home side) at the old stadium.  This amount also includes the construction fees including the general contractor, permit fees, etc.  (Estimated cost $20,379,304)

• Build a new field house for tennis / softball and girls soccer.  (Estimated cost $1,299,218)

• Add parking spaces near fields for softball, tennis, baseball.  (Estimated cost $160,878)

• Improve Swimming Pool facility with the addition of a cover to provide for year-round access to the pool. (Estimated cost $181,455)

• Expand the football practice fields to accommodate 2 additional fields.  (Estimated cost $362,910)

• Resurface existing practice track (Estimated cost $145,164)

Maintenance and Infrastructure Support
• Replace the HAVC (Air units) on the high school campus.  (Estimated cost $1,817,550)

• Provide the asbestos abatement and renovation of the 600 building at the high school.  (Estimated cost $1,860,104)

* Provide handicap lift at PTHS Theaters

* Provide handicap lift at Pine Tree Road Auditorium

* Provide handicap access ramp at Pine Tree High School

* Provide handicap access to the playground at Intermediate

* Provide sidewalk and canopy for student drop off/pick up at Intermediate  
Our mission is to continue a tradition of excellence by providing a high-quality and challenging educational environment, maximizing opportunities for the success of all students, equipping them to become responsible, involved, and productive citizens.

Copyright © 2016 - Pine Tree Independent School District

powered by ezTaskTitanium TM